Trevor & Dewey's RV-7 Construction Log
 
 

Wings - Fuel Tanks

Back to Log Index

Date: 6/3/2010
Time:
3.0
Task: Finished the left fuel tank

Tonight I finished riveting the outboard rib in the left fuel tank. I also installed the snap-bushings and vent line. I also sealed and riveted the vent line AN fittings, fuel pickup fitting, and safety wired the flop tube.