Trevor & Dewey's RV-7 Construction Log
 
 

Wings - Fuel Tanks

Back to Log Index

Date: 4/7/2010
Time:
3.0
Task: Started prosealing the right fuel tank.

We simply followed the same steps for the right tank as we did for the left. See the post made on 4/3/2010.