Trevor & Dewey's RV-7 Construction Log
 
 

Wings

Back to Log Index

Date: 10/2//2010
Time:
4.0
Task: Installed aileron/flap brackets and gap fairings.

Today we had a very productive work day. We first riveted the aileron brackets on both wings, and then installed the aileron and flap gap fairings. Everything went well with no issues.