Trevor & Dewey's RV-7 Construction Log
 
 

Wings

Back to Log Index

Date: 12/24/2009
Time:
2.0
Task: Continued work on ribs!

After finishing the right wing ribs today I started on the left wing. I used my template to mark the location for the electrical conduit in the ribs. I predrilled #40.




Then I opened up the conduit holes 3/4" with a Unibit. I also used a unibit to drill the upper and lower tooling holes to 3/8 for snap-bushings.




Here is a finished rib. Two 3/8" holes and a 7/16" in the middle.


ALL of the ribs have electical conduit and bushing holes drilled and deburred. Last thing to do is debur all the small and inner edges with emery cloth tomorrow.