Trevor & Dewey's RV-7 Construction Log
 
 

Wings

Back to Log Index

Date: 12/23/2009
Time:
6.0
Task: Continued work on ribs!

Today was busy! I match drilled all the spar to rib holes on both wings and then clecod the nose ribs in place and match drilled those.




I then removed all the main ribs and used a template to drill the electrical conduit hole in each rib. It is located on the bottom aft section of the first lighting hole near the main spar. Center is 1" up from the flange.




All of the right wing ribs drilled for electrical conduit and snap-bushings