Trevor & Dewey's RV-7 Construction Log
 
 

Wings

Back to Log Index

Date: 12/21/2009
Time:
6.0
Task: Deburred, fluted, and assembled ribs to spar


Deburred the lightening holes, edges, and started fluting the main wing ribs today. I was able to finish all of the right wing ribs and get a start on the left wing ribs. I was going to drill the electrical conduit holes first but decided to cleco the ribs in place first to make sure I had the orientation correct. I'll drill the holes after I've removed the ribs for priming.




The right wing ribs clecod to the main and rear spars. Starting to look like a wing!




Started fluting the left wing ribs and clecoing to the main spar.