Date: 12/03/2010
Time:
2.0
Task: Finished elevator pushrods


Today I drilled the F-789 pushrod with the rod ends and primed it and F-790. I only primed the inside and will let dry for a few days before riveting and priming the outside. I also primed the elevator bellcrank parts and rod ends.

Most of the evening was spent drilling the F-6118 rudder pedal brace to the bearing blocks and firewall angle for the given fore/aft postion of the ruddel pedals.