Trevor & Dewey's RV-7 Construction Log
 
 

Fuselage - Main

Back to Log Index

Date: 11/13/2010
Time:
4.0
Task: Tailwheel Weldment install


Started working on the aft part of the airplane today. Below you can see a picture of the area to be removed from the lower aft skin to allow relieff for the tailwheel weldment. I traced the template onto an 8 1/2 x 11 sheet of paper and taped it to the skin. We then proceeded to cut along the line with an airsaw and sand with a Dremel. After about an hour it was smooth and looked great.







Here is a trial fit of the weldment. I had to remove the F-712 rear bulkhead to get the weldment in place. Not sure at this point how to get the bulkhead back in correctly.