Trevor & Dewey's RV-7 Construction Log
 
 

Empennage - Fiberglass Tips

Back to Log Index

Date: 10/19/2009
Time:
3.0
Task: Lots of sanding and filling today.

Today was very productive. I started by trimming the fiberglass to the edge of the fairings.


Then I removed the tape from the left elevator fairing and the result was the picture below. The flox setup nicely.


Here is the result after a lot of filing and sanding. There are some air pockets but they will be filled with he micro slurry.


I found a box to cut holes into so I could mount the fairings vertically.


Here is my first mix of micro. I thickened it up a bit more after taking this photo.


Here is what the slurry looks like after being poured. We'll see how it looks in the morning!