Trevor & Dewey's RV-7 Construction Log
 
 

Empennage - Fiberglass Tips

Back to Log Index

Date: 10/12/2009
Time:
3.0
Task: Fitted, drilled, and countersunk the elevator fairings


I coerced the right tip into place and match drilled #30.


I then countersunk all the holes in the fairing. Finally I fabricated the 0.5" metal stips for reinforcement.


Rinse, lather, repeat for the left side.