Trevor & Dewey's RV-7 Construction Log
 
 

Empennage - Left Elevator

Back to Log Index

Date: 9/27/2009
Time:
3.0
Task: Prepped and primed left elevator parts

Today was spent washing all the left elevator parts with dawn and a Scotchbrite pad, then etching the parts with EkoEtch from Steward Systems.


I filed the edges of the skin and sanded them smooth before cleaning and etching.
Here is the skin after priming.


All the stiffeners and skeleton parts primed.