Trevor & Dewey's RV-7 Construction Log
 
 

Empennage - Left Elevator

Back to Log Index

Date: 9/24/2009
Time:
1.0
Task: Started clecoing together the left elevator skeleton.

I started by final drilling the E-606PP & 607PP reinforcement plates to the E-702 spar. I then clecod and final drilled the E-705 rib to the E-702 spar. The elevator control horn was the clecod into position and final drilled as well. I then final drilled the E-707 front spar to the E-705 rib.


I fluted the two counterbalance ribs (E-703/704)
, clecod together, final drilled the inside holes #30 and clecod on the E-613PP counterbalance skin.