Trevor & Dewey's RV-7 Construction Log
 

The RV-7 Project - N781TD

I finally embarked on a project I've only dreamed about, a Van's Aircraft RV-7. I've convinced my father to come on board and join me in this enormous undertaking. We are extremely excited to one day fly our 200mph airplane. Click the 'About the RV-7' link above for more information about the aircraft itself.

The construction log can be accessed by either clicking the 'Construction Log' link on the top menu or through the Build Phase box on the right.

What's New
Sept 21, 2016 - Fresh out of the paint shop!
Aug 9 - Started on the gear leg fairings and wheel pants
July 28 - Back from a wonderul trip to Oshkosh!
Latest Image

Project Total Time

2,189 hrs

Last Update 09/22/2016
Project Start Date: 08/21/2009
Build Phase

Shop Preparation
Wing Jigs

Empennage
Horizontal Stabilizer
Vertical Stabilizer
Rudder
Elevator
Fiberglass Tips

Wings

Flaps
Ailerons
Spars
Ribs

Main Wings
Fuel Tanks

Fuselage
Main

Finishing
Canopy
Wheels/Brakes
Electrical
Firewall Forward
Final Finishing
Exterior Painting

FLYING!

 




 

 Contact Me